STLC
Phases
|
Description
|
Test Planning
|
Prepare Test Strategy & Test Plan
( Prepared By Project Manager or Test
Manager )
|
Test Analysis
|
Study BRS & SRS ,If Any Questions
Documented in
RCN (Requirement Clarification Note) Send
To BA or SME
|
Test Design
|
Identify Test Scenarios & Prepare TC And
Prepare Traceability Matrix
|
Test Execution
|
Dev will Release Build to Testers, TE will
Execute TC on Build
& any defects Found Then Send It to Dev,
Dev Fix The Defect
and Modified Build Released To Testers
|
Test Closure
|
Test Lead or Test Manager Prepares Various Test
Summary Reports which has to Be Submitted
to the Client.
|
Test Planning :
Once a Project is
Initiated For Testing at First a Project Manager will Define a High
Level Plan
And Approach For Testing
The Application Called Test Strategy. From
The Test Strategy a Detailed Plan and Approach will Be Derived By
Test Lead Or
Test Manager is Called Test Plan.
Test Analysis :
In This Phase
Testers will Study Various Customer Requirement and Project
Specification
Documents to Understand the Business Requirements of the System. While
Analyzing The
Requirements if There is Any Questions that will be Documented in
RCN (Requirement Clarification Note)
it will Be Send To Domain Experts or BA To
Get The Clarifications.
BA Will Give Clarifications For the Posted
Questions And Send it Back to The Testers. You Can Also Initiate
For Walk
Through, If Still There are Queries.
Test Design :
In This Phase
Testers will Identify What are all the Various Functionalities To Be
Tested
Called Test Scenarios and Document The Same. Then TC and Test Data Prepared For
Identified
Test Scenarios , These TC will Be Send To Lead For Review and Also
To Prepare Traceability Matrix .
Test Execution :
In
This Phase at First Developer will Release Build To Testers And It Will Be
Deployed
in Test Environment . On The
Deployed Build Testers Will Conduct Testing
And Defects Identified Will Be Recorded And Send It to Developer .
Now
Developer Fix The Defects Then The Modified Build Will Be Release To Testers
For Retesting , Now Testers
Will Conduct Retesting To Confirm Bug Fixing And
Also To Determine The Side Effects . If Any New Defects Are
Identified , That
Defects will Be Documented And Reported To Developer. These Cycles Will Be
Continued Until
All Major Defects Are Fixed And Closed.
Test Closure :
It
is The Last Phase In STLC where a Test Lead Or Test Manager Prepares Various
Test Summary Reports which Has To Be Submitted To The Client. Now The Project
Will Be Delivered To
Customer For User Acceptance Testing. Once The UAT is
successful , Then Project Enters Into Maintenance
Phase where Production
Support Team Takes Care Of Project Maintenance.